All times PT

Thu 8/1
7:00 PM
30 Mins
This Old House
Lexington: Drop in the Gutter
A walking tour of the roof reveals its various pitches; installing a built-in gutter system; rough-in begins on the interior; energy-efficient windows are installed.
Thu 8/8
7:00 PM
30 Mins
This Old House
Lexington: Phased Out
Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.
Supported by